en

Innovative projects


BOIS & BUSINESS #3 - January 2024

01.01.2024
The SYLVATEST has just given a second life to the General Stores Warehouses of Paris (EMGP), a 150-year-old building transformed into a four-star...

Kalus Roussel Exhibition

18.04.2019
Le Groupe CBS-LIFTEAM soutient l'exposition de l'Agence Kalus Roussel, du 18 avril au 15 mai 2019 à la Galerie d'Architecture de...

Prix Innovation Bio Top 2023 - LIGNUM

20.09.2023
The aim of the BIO TOP wood innovation award is to encourage, support and promote innovation in the wood and bio-sourced materials sector. ...

Visit of housing Rue Domrémy, Paris

05.05.2021
Climate Plan rehabilitation - RIVP, City of Paris and Lifteam

BIO TOP - Wood Innovation Award 2022

08.09.2022
Finalist, the group will present its floor "la Métisse" on September 8 at the Hôtel des Horlogers, Le Brassus (Switzerland) ...

Dry sector - School of Perthes-en-Gâtinais

22.04.2021
The school... more than two years later !

Renewal of the D-Dalle® Technical Notice

15.03.2022
The D-Dalle® technical opinion is renewed for five years until October 31, 2027

Michelet High School, Vanves

25.11.2020
Michelet High School's sports facilities undergoing major renovations.

FDES, noEcho® acoustic panel

11.04.2022
The INIES database references the Environmental and Sanitary Declaration Sheet for the noEcho® acoustic panel

Aqualudic swimming pool, France

04.09.2020
It's back to school at the aqualudic pool of the Stade Auvergne-Rhône-Alpes !

Variable geometry aerial headpieces

03.04.2023
The sports hall is encircled by a succession of slender steel posts supporting a BLC wooden framework in the form of a mega-mesh, covered with a...

Inauguration of "La Ruche " preschool

01.12.2018

30 years of wood innovation

01.06.2021
CBS-Lifteam Group has been supporting the International Wood Construction Forum since the very first edition in Beaune in 2011.

Renewal of D-Dalle technical notice

09.01.2018
L'avis technique D-Dalle est renouvelé pour trois ans jusqu'au 30 avril 2021

Demountable auditorium building system

06.03.2020
Agora demountable auditorium system launched by architects Studio Andrew Todd and carpenters CBS-Lifteam

Polux 5

20.12.2016
Nouvelle génération POLUX avec le POLUX 5

Laboratory assessment, fire resistance

30.10.2019
Assessment of the fire behaviour of the process of large span floors designed by CBS

Inauguration de l'Espace Ardea-Alba

04.11.2016

ALN | Atelien Architecture Exhibition

12.09.2019
Le Groupe CBS-LIFTEAM soutient l'exposition de l'Agence ALN | Atelien Architecture, du 12 septembre au 5 octobre 2019 à la galerie...