Sports complex, Rueil-Malmaison (France)

Construction of an aquatic center (two pools, a water lagoon and a wellness area), a sports facility (an athletics track, three multi-sports fields and jumping areas) and a gymnasium (two handball courts, a table tennis hall, a multi-purpose room, two dojos and a physical preparation room) ;

Services : studies, supply and installation of noEcho® acoustic cladding (1778 m²) and design, supply + assistance with the assembly of the wooden structure of the curtain wall.

 

  • Contracting authority : Commune de Rueil-Malmaison (France)
  • Architect : Rudy Ricciotti (Bandol, France) / Coste Architectures (Houdan, France)
  • Design office structure : Lring (Bandol, France)
  • Wood structure design office : CBS (Choisy-le-Roi, France)
  • Carpenter : Lifteam (Subsidiary IDF Choisy-le-Roi, France)
  • Prefabrication workshop : Ecotim (La Rochette, France)
  • Surface : 12'000 m² (including gymnasium : 7600 m²)
  • Environmental approach : "Exceptional" HQE (High Environmental Quality) Label
  • Total cost of the work : 33,4 M € ex. VAT
  • Amount of the wood lot : 681’000 € ex. VAT
  • Year of delivery : December 2020